Hooked on the PH9000 Pipe Hook: Atlas Services at the Bailey Mining Site

Atlas using the Pipe Hook

Sometimes we get a little bit lucky here at Kenco and don’t have to drive far for great jobsite footage. This particular jobsite is in our neck of the “west” woods of Pennsylvania at the Bailey mining site, part of the PA mining complex. A quick background on the PA Mining Complex … it is several times larger than the island of Manhattan and the largest producing underground coal mining operation presently in North America with an annual production capacity of 28.5 million tons of coal. (Coal-tastic!)

But this story isn’t about the mines in PA, but rather Atlas Services, who connected with us here at Kenco for a solution to set 8-ft joints of 36” reinforced concrete pipe.

Certainly that’s something we can handle! We were able to not only offer them one but TWO solutions – the PH9000M Mechanical Pipe Hook and the PH9000 Self Leveling Pipe Hook. Both Kenco pipe hooks have a 9,000 pound capacity and can move/set 12” to 48” RCP. There are two distinct differences and often it comes down to the contractor’s preference on which to use.

The Mechanical Version of the Kenco pipe hook allows the user to choose a specific angle the pipe will rest at in order to set it. It uses a slide mechanism that can be moved from one tooth to another to either increase or decrease the angle of the pipe. It is easy to adjust; just relieve the tension on the sling that the hook is attached to and move the excavator arm forward or back to find the wanted position.

The second option and the one that Atlas found to be most fit for their project, was the PH9000 Self Leveling version. This Kenco pipe hook uses a specially-designed, pre-charged cylinder that levels the pipe based on its weight to achieve the proper set position. It requires no adjustments to level the pipe and is as simple as hooking it up to the sling/shackle assembly. As you can see from the video footage and multiple photos we obtained, the hook gave Atlas an upperhand.

They were able to set pipe in much less time that straps would have provided. They also remain safe during the entire procedure, which is something Kenco REALLY likes to see. See it for yourself on YouTube!

Thank you to Atlas Services for sharing your job story with us and welcome to the Kenco Workforce!

 

Contact/Company Name:

“Bucky” Watters | Atlas Services | Eighty Four, PA

Featured Project Detail:

Setting 36” RCP Pipe at the Bailey Mine Site

Equipment Used:

PH9000 Self Leveling Pipe Hook

 

If you would like to be highlighted in one of our Featured Projects, please contact sm@kenco.com.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.