Kenco Multilift moving limestone block

Featured Project – D & D Foundations, Inc. and the Multilift

No two residential retaining wall projects are ever the same. Function, strength, and longevity will always be of utmost concern to the contractor. Revisiting the job in the near future to fix a failing wall (especially one they installed) is not a call they hope to get! However, when we talk about residential jobs there is another huge factor that comes into play – the homeowner. Certainly, no homeowner wishes to sit on the back porch drinking a cup of coffee while staring at a boring ole block wall. This wall must not only function well, it must also be aesthetically pleasing.

To solve this problem, many contractors look to limestone block. Its face gives a rough ‘n’ rugged character that seamlessly blends with the surrounding landscape. All the while these blocks provide a strong and sturdy blockade to the naturally eroding earth on the other side. They are a solution that consistently appeases both the contractor and customer.

That’s brings us to today’s featured project by D & D Foundations, Inc of Houston, Texas. The project is one similar to the above situation – 2100 pound limestone blocks in Texas and a residential retaining wall. Kenco’s fundamental contribution to this job was the Multilift, more specifically – the ML8K10T48V1. The grip range (10-48”) suited these block quite well and allowed for lifting on the wide or narrow side. For this project, the Multilift was placed from the front to back. The lifter’s capacity of 8,000 pounds exceeded what could have been expected from even the largest of the block.  

Kenco Multilift moving limestone block   Kenco Multilift moving limestone block   Kenco Multilift moving limestone block   Kenco Multilift moving limestone block

“Setup was (also) very easy,” Ruben Gonzalez stated, and he is certainly correct. All that is needed is a lift eye, a Rigmax (or similar), and a machine capable of lifting the weight. D & D had previously “tried moving the blocks with other methods with different tractors.” Although these methods were not without success, they do come at the sacrifice of time spent. And as any contractor knows – time lost means money lost. And Ruben would agree. “This Multilift has saved us time and labor expenses. We would be behind schedule without it.”

Thank you Ruben and to D & D Foundations, Inc. for becoming a member of the Kenco Workforce. We look forward to working with you in the future.

 

Contact/Company Name:

Ruben Gonzalez  |  D & D Foundations, Inc.  |  Houston, TX

Featured Project Detail:

Retaining wall system installation using limestone blocks weighing approximately 2,100 pounds

Equipment Used:

Kenco Multilift: ML8K10T48V1

 

If you would like to be highlighted in one of our Featured Projects, please contact sm@kenco.com.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.